الأرشيف: Cases

ديسمبر 11, 2021 eyad لا توجد تعليقات

OIL SHALE DIRECT FIRE PROJECT ATTARAT POWER PROJECT

CLIENTChina Energy Engineering Company Guangdong Power Engineering Co DURATION4 Years FREIGHT VALUEUSD 14,000,000 VOLUME+220,000 Freight Ton Over +4000 Containers LARGEST UNIT ARRIVED AND TRANSPORTED IN JORDAN SINCE 1996 LOCATION: Ghour El Safi TYPE OF WORK: Customs Clearance and Transportation DURATION: Seven Days VOLUME: 1 Package. DIMENTIONS: L 25 Meter X Dia. 9.5 Meters WEIGHT: 140 […]

ديسمبر 11, 2021 eyad لا توجد تعليقات

CRYSTALLIZER XLR#3 ARAB POTASH COMPANY

LOCATIONGhour El Saf TYPE OF WORKCustoms Clearance and Transportation DURATION7 Days WEIGHT140 MT Although both transportation and logistics deal with getting valuables from one location to another, logistics has added benefits and functions. Logistics executives also have to make decisions dealing with packaging, containerization, documentation, insurance, storage, importing and exporting regulations, freight damage claims, working […]

ديسمبر 11, 2021 eyad لا توجد تعليقات

AQABA – ISKENDERUN & MARSEEN

LOCATIONPort Of Aqaba TYPE OF WORKRORO DURATION3 Days VOLUME3000 Cars The largest RORO ship was docked for loading cars in the port of Aqaba. and Estimated tonnage was around 7200 car and our specialized staff wear there for the process of overseeing the cars loading. The ship arrived to the port of Iskenderun within three […]

ديسمبر 11, 2021 eyad لا توجد تعليقات

MRC CCR + HDS COMPLEX PROJECT (MODULAR CCR)

CARGOA modular 450PPH Cycle max CCR Regeneration Section with chlorsor. GROSS WEIGHT564447.00 kg. MEASUREMENT6907.751 CBM. JOB SITEDaura site- Baghdad, Iraq. CARGO: A modular 450PPH Cycle max CCR Regeneration Section with chlorsor. GROSS WEIGHT: 564447.00 kg. MEASUREMENT: 6907.751 CBM. VESSEL NAME: SE PANTHEA. VOYAGE: 302PPORT OF LOADING: Daebul port, South Korea PORT OF DISCHARGE: Umm Qaser […]

ديسمبر 11, 2021 eyad لا توجد تعليقات

SHAT AL BASRA PROJECT

CONSIGNEEMinistry of Electricity – Baghdad, Iraq CARGO5 Transformers with Accessories Supply of Generator Step up (GSU) Transformers TOTAL CBM4331.34 TOTAL WEIGHT1,898,690 kg LAND TRANSPORTATION FROM UMM QASER TO SHAT AL BASRA SITE AT IRAQ CONSIGNEE: Ministry of Electricity – Baghdad, Iraq CARGO: 5 Transformers with Accessories Supply of Generator Step up (GSU) Transformers TOTAL CBM: […]

هذا الموقع مسجل على wpml.org كموقع تطوير. قم بالتبديل إلى مفتاح موقع الإنتاج إلى remove this banner.